Krishna Gaurav

Engineering & System Integration – Mining.

Engineering & System Integration – Mining. Reliable Controls performed engineering and system integration for a water supply and distribution system at a large-scale mining facility located in Mexico. This work was based on an assessment previously done by Reliable Controls and addressed several issues identified in the assessment. Reliable Controls performed detailed engineering of the […]

Mine-Affected Water Improvement

Mine-Affected Water Improvement RCC used many unique methods to successfully complete this project, but two of the most crucial were our work pack documentation process and our P&ID and PFD systemization approach. Beginning in October of 2016, Reliable Controls took part in a project that aims to significantly improve the quality of mine-affected water. The […]

Bald Mountain Gold Mine PLC Programming & Commissioning

Bald Mountain Gold Mine PLC Programming & Commissioning Reliable Controls’ unique engineering work methods and approach resulted in successful on-time project completion and a happy client! SNC Lavalin contracted Reliable Controls to provide programming and commissioning services for the Bald Mountain mine located in the Southern Ruby Mountains of northeastern Nevada. Bald Mountain is an […]

Gold Mine Retort Modifications

Gold Mine Retort Modifications Assessment, Control Systems Engineering and Commissioning Reliable Controls provided a detailed assessment, recommendations, engineering and commissioning for modifications of the Retort process at the Nevada gold mine. Retort is a process used to remove mercury vapors present in smelting operations. After a complete engineering and regulatory review of the process and […]

Pueblo Viejo Mine

Pueblo Viejo Mine Reliable Controls Corporation was proud to be part of this large-scale, world-class mining project and enjoyed becoming our client’s go-to team in the field. The Pueblo Viejo mine is a multi-billion-dollar mining facility located in the central part of the Dominican Republic. The site, which is a sulfidic refractory gold deposit, is […]

Acadian-Haynesville Pipeline Extension Factory Acceptance Testing and Pre-commissioning

Acadian-Haynesville Pipeline Extension Factory Acceptance Testing and Pre-commissioning The project was challenging due to a dynamic construction schedule and the fact that the stations were in remote locations over a large geographical area The Acadian Haynesville Pipeline Extension project is a 270-mile long natural gas pipeline extension in Louisiana, originating in Red River Parish and […]

Jackrabbit Natural Gas Compressor

Jackrabbit Natural Gas Compressor Reliable Controls completed the Jackrabbit Compressor Station project on time and within budget, earning praise from the client. The Jackrabbit Compressor Station is a greenfield natural gas compression facility located in a remote area of Western Colorado. Reliable Controls performed field inspection of all equipment, commissioning and start-up services for this […]

Questar – Blacks Fork Processing Plant

Questar – Blacks Fork Processing Plant RCC’s mission was to replace the Allen Bradley-based PLC 5 controls system in fractionation train l and Blacks Fork I cryo and associated support equipment and Emergency Shutdown system (ESD) with a new Allen Bradley-based Control Logics PAC and iFix HMI software. Located in Southwest Wyoming, the Blacks Fork […]

Copper Mine Sulfur Burner – Control Systems Engineering and Commissioning

Sustainability The Future of Mining  Recently, our team traveled to Europe for an exciting and innovative project at a mine two miles south of Whitby, in the UK’s North York Moors National Park. At RCC, we’re fully committed to sustainable development, and we believe in the importance of combining innovation and mining processes for a […]

Copper Sulphide Precipitation Process Plant

Tailings Project   If you work in mining, you know that tailings management is a necessary part of any successful operation. If you don’t, the term “tailings” refers to the waste materials that are left over after the process of separating the commodity of value from the ore. Handling this waste in an environmentally friendly way […]