Questar - Blacks Fork Processing Plant

For the commissioning of this new controls system RCC generated work packages, including procedures, drawings and check sheets for all terminations, control power distribution, field instruments and equipment for use by the commissioning team.

Located in Southwest Wyoming, the Blacks Fork Processing Complex is composed of three NGL extraction plants with a total of 785 MMcfpd of gas processing capacity: Blacks Fork I cryo—85 MMcfpd, Blacks Fork II cryo—420 MMcfpd, and Blacks Fork JT—280 MMcfpd, and two fractionation trains: train one at a capacity of 5,000 Bbl/d and train 2 at a capacity of 10,000 Bbl/d.