Ensuring Electrical Reliability at the Pueblo Viejo Gold Mine

Project Overview

Reliable Controls performed comprehensive relay testing and pre-operational checks at the Pueblo Viejo mine, ensuring system integrity and operational readiness. By implementing advanced documentation methods and precise commissioning, they optimized electrical reliability, streamlined defect tracking, and reinforced trust with the client.

USE CASE

Need Text

Client Objective

A large-scale mining facility required a robust and standardized control system for its water supply and distribution network. Previous assessments had identified critical issues in system communications, I/O handling, and interlock programming. Reliable Controls was engaged to engineer and integrate a solution that would enhance system performance and reliability.

Challenges and Solutions

Control System Deficiencies

Addressed previously identified issues through detailed engineering and system integration.

Lack of Standardization

Developed programming standards, system templates, and interlock matrices to ensure uniformity and efficiency.

Communication & I/O Handling Issues

Implemented structured configurations for seamless integration and improved operational reliability.

Solution Implementation

Reliable Controls executed a comprehensive engineering and system integration process, including:

Control System Engineering

Developed interlock matrices, I/O listings, and control narratives for each well pump.

Programming Standards

Created standardized templates for equipment controls, I/O handling, and communications.

Visualization & Alarming

Developed HMI process graphics to enhance real-time monitoring.

Safety & Compliance Support

Provided subject matter experts for the HAZOP process.

Results & Benefits

Enhanced Reliability

Standardized system configurations reduced inconsistencies and improved operational stability.

Improved Monitoring

Advanced HMI graphics provided better visualization of water distribution processes.

Successful System Validation

The SAT was completed, documented, and transmitted to the client, ensuring compliance and operational readiness.

Conclusion

By implementing industry best practices, Reliable Controls delivered a scalable, efficient, and standardized control system for the mining facility. The improvements in system integration, communication protocols, and monitoring capabilities have provided the client with a more reliable and maintainable water distribution infrastructure.