Blacks Fork Processing Plant
Project Overview
A large-scale mining facility required a robust and standardized control system for its water supply and distribution network. Previous assessments had identified critical issues in system communications, I/O handling, and interlock programming. Reliable Controls was engaged to engineer and integrate a solution that would enhance system performance and reliability.
USE CASE
Reliable Controls optimized mining water distribution by standardizing controls, improving I/O handling, and refining interlocks.
Client Objective
Fluor Corporation engaged Reliable Controls Corporation to perform relay testing, electrical pre-operational testing, and commissioning services at the Pueblo Viejo mine, a multi-billion-dollar mining facility in the Dominican Republic. With a design capacity of 24,000 tons per day, this world-class mine required precise electrical testing and commissioning to ensure safe and efficient operations.
Challenges and Solutions
Control System Engineering
Lack of Standardization
Communication & I/O Handling Issues
Implemented structured configurations for seamless integration and improved operational reliability.
Communication & I/O Handling Issues
Solution Implementation
Reliable Controls executed a comprehensive engineering and system integration process, including:
Protective Relay Testing
Tested 280 protective relays using specialized equipment.
Programming Standards
Visualization & Alarming
Safety & Compliance Support
Results & Benefits
Enhanced Reliability
Standardized system configurations reduced inconsistencies and improved operational stability.
Improved Monitoring
Advanced HMI graphics provided better visualization of water distribution processes.
Successful System Validation
The SAT was completed, documented, and transmitted to the client, ensuring compliance and operational readiness.