Enhancing Retort Process Efficiency and Compliance at a Nevada Gold Mine
Project Overview
Reliable Controls enhanced the Retort process at a Nevada gold mine, ensuring compliance, improving safety, and optimizing efficiency through advanced automation and system integration.
Client Objective
Fluor Corporation engaged Reliable Controls Corporation to perform relay testing, electrical pre-operational testing, and commissioning services at the Pueblo Viejo mine, a multi-billion-dollar mining facility in the Dominican Republic. With a design capacity of 24,000 tons per day, this world-class mine required precise electrical testing and commissioning to ensure safe and efficient operations.
Challenges and Solutions
Large-Scale Electrical System Complexity
Conducted rigorous testing of 280 protective relays across multiple voltage levels.
Ensuring System Integrity Before Operation
Lack of Standardization
Solution Implementation
Reliable Controls executed a comprehensive engineering and system integration process, including:
Protective Relay Testing
Tested 280 protective relays using specialized equipment.
Custom Work Packages
Developed tailored testing procedures to ensure accuracy and efficiency.
Paperless Documentation
Recorded testing results digitally, including before-and-after conditions and defect tracking.
Electrical Pre-Operational Testing & Commissioning
Results & Benefits
Reliable Controls executed a comprehensive engineering and system integration process, including:
Enhanced Electrical System Reliability
Optimized Operational Readiness
Successful System Validation
Seamless Integration with Client Operations
Conclusion
Reliable Controls Corporation played a critical role in ensuring the electrical reliability and operational readiness of the Pueblo Viejo mine. Through rigorous testing, precise commissioning, and innovative documentation methods, RCC delivered a seamless and efficient service, solidifying its position as a trusted partner in the field.